By Project
By Program
2451 Washington Design Package 2017-03-21
Document Type
N/A
|
Project
2451 Washington Street
|
Document Date:
03/27/2017
|
-
Neighborhoods(s)
-
Departments
Description
2451 Washington Design Package 2017-03-21
toggle the div
Inclusionary Development Policy Flow Chart - Process for Development Review
Document Type
Presentation, Regulations
|
Project
N/A
|
Document Date:
03/23/2017
|
-
Neighborhoods(s)
N/A
-
Departments
toggle the div
-
Neighborhoods(s)
-
Departments
Description
Presentation for the JPNC Zoning Committee Meeting held on March 22, 2017
toggle the div
-
Neighborhoods(s)
-
Departments
toggle the div
-
Neighborhoods(s)
-
Departments
Description
Madison Park Development Corporation (MPDC) is proposing to construct a four story building with 16 units, 14 off-street sheltered parking spaces, two off-street open parking spaces and a loading space to provide homeownership opportunities in the Dudley Square area. The building will occupy frontage at the corner of Washington St. and Shawmut Ave. It is across from the Area B2B police station on Washington Street.
toggle the div
Live Work Connect PowerPoint Template
Document Type
N/A
|
Project
N/A
|
Document Date:
03/21/2017
|
-
Neighborhoods(s)
N/A
-
Departments
Description
Live Work Connect PowerPoint Template 2017-03-21
toggle the div
-
Neighborhoods(s)
-
Departments
toggle the div
-
Neighborhoods(s)
-
Departments
toggle the div
-
Neighborhoods(s)
-
Departments
Description
5205 Washington Street SPRA 2017-3-17
toggle the div
-
Neighborhoods(s)
-
Departments
Description
Comments - 1000 Boylston PNF 3.17.17
toggle the div