Common Allbright

Neighborhood
Allston
Land Sq. Feet
32,589 sq ft
Gross Floor Area
114,475 sq ft
BPDA Contact
Project Description
The Proposed Project is located within the Allston-Brighton Neighborhood District, containing approximately 0.75 acres (32,589 SF) of land area and fronts both Lincoln Street and Cambridge Street. The site is located two blocks west of the Mass Turnpike and Storrow Drive and is within walking distance of the new Boston Landing station on the MBTA Framingham/Worcester Commuter Rail Line. The property currently contains an approximately forty-five (45) space surface parking lot, which is proposed to be replaced with a six (6)-story co-living residential building, totaling approximately 125,175 gross square feet (GSF), and an at-grade parking garage providing approximately thirty (30) accessory parking spaces with additional night parking available in the 510 Lincoln Street parking lot. The residential building is proposed to contain a total of approximately 80 units. The residential building will also provide approximately 278 accessory bicycle parking spaces, an on-site car-share dedicated to tenants, approximately 4,850 SF of residential amenity space, including both indoor and outdoor spaces and approximately 1,300 SF of dedicated, flexible community space.

Project Phase

Help
  • Letter of Intent
  • Under Review
  • Board Approved
  • Under Construction
  • Construction Complete

STAY CONNECTED

Allston Large Project