CityOfBoston Official An official website of the City of Boston

Main Street Interim Deployable

The project includes the construction of three (3) segments of free-standing retaining walls. The proposed walls are to be cast-in-place concrete walls with a stamped façade that is anticipated to provide consistency with the finish of the adjacent structures and walls at the Schrafft’s property to maintain a visually connected streetscape. The project will also include the installation of temporary, deployable flood barriers that include removable posts, stop logs, and a swing gate. The work also includes a raised crosswalk, sidewalk reconfiguration and modification of drainage structures to accommodate the street changes.

Type Bid
Status Under Review
Date Available 10/20/2025 09:00
Due Date 11/06/2025 12:00
Pre Bid Meeting Date 10/27/2025 13:00
Contact [email protected]