By Project
By Program
-
Neighborhoods(s)
-
Departments
Description
Public Meeting Presentation
toggle the div
Ashmont TOD 2 (1971-1977 Dorchester Avenue) BCDC Votes 2014-09-02
Document Type
Votes
|
Project
Ashmont TOD 2
|
Document Date:
09/02/2014
|
-
Neighborhoods(s)
-
Departments
toggle the div
Dorchester Terrain (DWG)
Document Type
3D Models
|
Project
N/A
|
Document Date:
08/20/2014
|
-
Neighborhoods(s)
-
Departments
Description
3D terrain of Dorchester in DWG format.
toggle the div
-
Neighborhoods(s)
-
Departments
Description
2014-08-14
submitted to the Boston Redevelopment Authority
submitted by Trinity Ashmont Two Limited Partnership
prepared by Fort Point Associates, Inc.
in association with The Architectural Team, Inc.
Kelly Engineering
Nitsch Engineering
WilmerHale
McPhail Associates, LLC
New Ecology, Inc
toggle the div
-
Neighborhoods(s)
-
Departments
toggle the div
Mt Vernon Street Design May 29 Comm Mtg Breakout Group Notes- Identity
Document Type
Meeting Notes
|
Project
N/A
|
Document Date:
05/29/2014
|
-
Neighborhoods(s)
-
Departments
N/A
toggle the div
Mt Vernon Street Design May 29 Comm Mtg Breakout Group Notes- Street
Document Type
Meeting Notes
|
Project
N/A
|
Document Date:
05/29/2014
|
-
Neighborhoods(s)
-
Departments
N/A
toggle the div
Mt. Vernon Street Redesign Public Workshop #2 Powerpoint
Document Type
N/A
|
Project
N/A
|
Document Date:
05/29/2014
|
-
Neighborhoods(s)
-
Departments
N/A
toggle the div
May 29 2014 Identity Discussion Summary
Document Type
N/A
|
Project
N/A
|
Document Date:
05/29/2014
|
-
Neighborhoods(s)
-
Departments
N/A
Description
Mt Vernon St Discussion summary on Identity
toggle the div
Downtown Waterfront MHPAC Meeting No. 11 Notes 4-23-14
Document Type
N/A
|
Project
N/A
|
Document Date:
04/23/2014
|
-
Neighborhoods(s)
-
Departments
toggle the div