Document Center

A-to-Z

Documents related to planning, research, maps, policy, annual reports and more—as well as Article 80 development project documents from before 2015—are available below.

Article 80 development project documents from 2015 to the present are available in the Article 80 Records Library.

By Document Type

By Neighborhood

By Project

By Department

By Program

2021-03-05 Allston-Brighton Article 80 Mitigation Tracking

DOWNLOAD pdf 574 KB

Document Type

Analysis or Study, Report

Project

N/A

Document Date:
03/05/2021
toggle the div

Implementation Status as of January 2021: Western Avenue Intersection & Corridor Improvements

DOWNLOAD pdf 10.2 MB

Document Type

Presentation

Project

N/A

Document Date:
01/15/2021

Description

Western Avenue at Leo M. Birmingham Parkway and Arsenal Street Intersection & Corridor Improvements

toggle the div

Implementation Status as of November 2020: Western Avenue Intersection & Corridor Improvements

DOWNLOAD pdf 10.2 MB

Document Type

Presentation

Project

N/A

Document Date:
11/30/2020

Description

Western Avenue at Leo M. Birmingham Parkway and Arsenal Street Intersection & Corridor Improvements

toggle the div

Draft Allston-Brighton Mobility Plan 2020-11-11

DOWNLOAD pdf 116 MB

Document Type

Plans

Project

N/A

Document Date:
11/13/2020
toggle the div

Draft Allston-Brighton Mobility Plan Executive Summary2020-11-11

DOWNLOAD pdf 4.4 MB

Document Type

Plans

Project

N/A

Document Date:
11/13/2020
toggle the div

Allston-Brighton Mobility Draft Plan Flyer

DOWNLOAD pdf 614 KB

Document Type

Advertisement

Project

N/A

Document Date:
11/13/2020
toggle the div

Allston-Brighton Mobility Draft Plan Flyer Espanol

DOWNLOAD pdf 622 KB

Document Type

Advertisement

Project

N/A

Document Date:
11/13/2020
toggle the div

South Boston Seaport Strategic Transit Plan Sample Strategy Evaluation and Metric Summary

DOWNLOAD pdf 6.4 MB

Document Type

Data

Project

N/A

Document Date:
07/09/2020
toggle the div

South Boston Seaport Strategic Transit Plan Short-Term Strategy Definition and Scoring Sheets

DOWNLOAD pdf 13.4 MB

Document Type

Analysis or Study, Data

Project

N/A

Document Date:
07/09/2020
toggle the div

South Boston Seaport Strategic Transit Plan Project Update with Short-Term Draft Evaluation Results

DOWNLOAD pdf 1.6 MB

Document Type

Project Update

Project

N/A

Document Date:
07/09/2020
toggle the div
  • Boston Planning & Development Agency
  • One City Hall Square, Boston, MA 02201
  • Tel: 617.722.4300  Fax: 617.248.1937
  • © 2021 Boston Planning & Development Agency