By Project
By Program
Central Artery Ramp Parcel Study - Public Meeting #2 - PowerPoint Presentation - 2014-09-30
Document Type
N/A
|
Project
N/A
|
Document Date:
09/30/2014
|
-
Neighborhoods(s)
-
Departments
N/A
toggle the div
Downtown Waterfront MHPAC Meeting No. 16 PowerPoint Presentation 9-22-14
Document Type
Presentation, Presentations
|
Project
N/A
|
Document Date:
09/22/2014
|
-
Neighborhoods(s)
-
Departments
toggle the div
Downtown Waterfront MHPAC Meeting No. 15 PowerPoint Presentation 9-10-14
Document Type
Presentation, Presentations
|
Project
N/A
|
Document Date:
09/10/2014
|
-
Neighborhoods(s)
-
Departments
toggle the div
-
Neighborhoods(s)
-
Departments
toggle the div
Downtown Waterfront MHPAC Meeting No. 12 PowerPoint Presentation 5-28-14
Document Type
Presentation
|
Project
N/A
|
Document Date:
05/28/2014
|
-
Neighborhoods(s)
-
Departments
toggle the div
-
Neighborhoods(s)
-
Departments
Description
Design revision for 375-399 Chestnut Hill Avenue (Cleveland Circle Cinema).
toggle the div
Downtown Waterfront MHPAC Meeting No. 11 PowerPoint Presentation 4-23-14
Document Type
Presentation, Presentations
|
Project
N/A
|
Document Date:
04/23/2014
|
-
Neighborhoods(s)
-
Departments
Description
Proposed MHP Framework
Presentation to the Boston Municipal Harbor Planning Advisory Committee
toggle the div
Building Boston: Through Article 80 Development Review
Document Type
N/A
|
Project
N/A
|
Document Date:
04/22/2014
|
-
Neighborhoods(s)
N/A
-
Departments
N/A
Description
Article 80 Development Review Infographic
toggle the div
-
Neighborhoods(s)
-
Departments
Description
375-399 Chestnut Hill Ave - Cleveland Circle Supplemental Information 4-1-2014
toggle the div
Mount Vernon St. Redesign Kickoff Powerpoint
Document Type
Presentation
|
Project
N/A
|
Document Date:
03/27/2014
|
-
Neighborhoods(s)
-
Departments
Description
Presentation given at the Mt. Vernon St. Redesign meeting in Columbia Point, Dorchester.
toggle the div