<?xml version="1.0" encoding="utf-8"?><rss version="2.0">
<channel>
<title><![CDATA[Resilient East Boston Waterfront Project Public Site Walk]]></title>
<link><![CDATA[http://www.bostonplans.org/news-calendar/calendar/2025/11/06/resilient-east-boston-waterfront-project-public-si?rss=1]]></link>
<description><![CDATA[<p>
	&nbsp;Join the City of Boston Planning Department for a public site walk of the Resilient East Boston Project at Carlton Wharf / Lewis Mall. This site walk will take place during a monthly high tide event.</p>
<p>
	The project team will begin the tour at the Lewis Mall Ferry Wharf, make its way&nbsp; towards Piers Park then loop back around to end at the Carlton Wharf project area. This site walk will be a space for folks to hear from the project team about the current designs being permitted and how those designs will shape the urban environment.</p>
<p>
	In the case of inclement weather the site walk will be postponed. We will still walk the site if it is lightly raining - updates will be made on the Planning Department calendar.<br />
	<br />
	&nbsp;</p>
]]></description>
<language><![CDATA[en-US]]></language>
<item>
     <guid isPermaLink="false">c463a996-96f8-4f66-8c07-30d10910e1ab</guid>
     <title><![CDATA[Resilient East Boston Waterfront Project Public Site Walk]]></title>
     <description><![CDATA[/News-Calendar/Calendar/2025/11/06/Resilient-East-Boston-Waterfront-Project-Public-Si]]></description>
     <pubDate>Thu, 06 Nov 2025 15:30:00 GMT</pubDate>
     <link><![CDATA[http://www.bostonplans.org/news-calendar/calendar/2025/11/06/resilient-east-boston-waterfront-project-public-si]]></link>     	
</item>
</channel>
</rss>
